Home » Case Studies » Spire Hospital, Bristol
CLIENT: William Hare Ltd
William Hare Ltd
Installation of 220mm diameter ODEX and 350mm diameter CFA bearing piles, socketing into the Clifton Down Limestone Formation.
ODEX and CFA Bearing Piles
£58,649.02