Home » Case Studies » Steel Cased Bottom Driven Piles, Avonmouth
Case study: Steel Cased Bottom Driven Piles, Avonmouth
CLIENT: Bluedot Construction
Home » Case Studies » Steel Cased Bottom Driven Piles, Avonmouth
Home » Case Studies » Steel Cased Bottom Driven Piles, Avonmouth
CLIENT: Bluedot Construction
Bluedot Construction
As part of a new build commercial steel frame development, our repeat business Client Bluedot Constriction appointed us to install 49nr 220mm diameter steel cased bottom driven piles.
In soft soils conditions such as those which can be expected in Avonmouth, and along the Severn Estuary more generally, the use of our 9.0t mini drop hammer rigs can help to significantly reduce site set up costs. With low noise & vibration, and minimal follow on pile cropping requirements, this is a useful system for a range of projects.
Steel Cased Bottom Driven Piles
Unit 12 Kenn Court,
South Bristol Business Park,
Roman Farm Rd,
Bristol BS4 1UL,
United Kingdom
Tel: 01173015480
E-mail: info@gemechltd.co.uk
Metro Centre,
28 Dwight Rd, Northwood,
Watford WD18 9SB,
United Kingdom
E-mail: info@gemechltd.co.uk