Case studies
We have built a reputation on successfully completing challenging projects, from major commercial contracts to domestic and residential sites. See below a range of these completed projects.
Home » Case Studies » Page 2
We have built a reputation on successfully completing challenging projects, from major commercial contracts to domestic and residential sites. See below a range of these completed projects.
Installation of 220mm diameter ODEX and 350mm diameter CFA bearing piles, socketing into the Clifton Down Limestone Formation.
Installation of 220mm diameter driven piles within former Salvation Army building, using our Vermeer rig in ‘low headroom’ mode, with less than 2.0m access height.
Vibro replacement stone columns to multiple structures at a new build waste transfer site that required GeMechs ground improvement solutions.
A vibro stone column ground improvement solution alternative to the originally proposed traditional piling scheme, permitting the use of lightly reinforced shallow strip foundations to a new build care home.
Installation of 220mm diameter steel cased bottom driven piles, and R.C ground beams, installed over a multiple visits to site.
Installation of 103no. 220mm diameter steel cased bottom driven piles to depth of up to 24.0m.
Unit 12 Kenn Court,
South Bristol Business Park,
Roman Farm Rd,
Bristol BS4 1UL,
United Kingdom
Tel: 01173015480
E-mail: info@gemechltd.co.uk
Metro Centre,
28 Dwight Rd, Northwood,
Watford WD18 9SB,
United Kingdom
E-mail: info@gemechltd.co.uk