We have built a reputation on successfully completing challenging projects, from major commercial contracts to domestic and residential sites. See below a range of these completed projects.
Installation of 220mm diameter driven piles within former Salvation Army building, using our Vermeer rig in ‘low headroom’ mode, with less than 2.0m access height.
Installation of 600mm diameter CFA Piles to form floodlight bases at multiple restricted locations. Required tracking our 14.0t restricted access rig across the cricket outfield.